On-prem → Cloud Migration

Move infrastructure off the rack
without losing your footing.

We plan, migrate, and validate on-prem workloads into AWS, Azure, or GCP in scheduled waves — every server accounted for, every cutover rehearsed before it counts.

160+Workloads migrated
42 minAvg. cutover window
0Data-loss incidents
WAVE-03 · LIVEREGION: us-east-1
ON-PREM DC-01 · VMware CLOUD Landing zone VALIDATING

The wave method

Five steps, repeated per wave — never per outage.

Migrations fail when they're treated as one big cutover. We break every environment into waves grouped by dependency and risk, so a bad surprise touches one wave, not the whole estate.

01
Discover & assess
Full inventory of servers, dependencies, licenses, and traffic patterns — including the undocumented ones nobody remembers standing up.
02
Plan the wave
Workloads grouped by risk and dependency into cutover waves, each with a scheduled window and a named rollback path.
03
Migrate
Replicate and sync ahead of time so the actual cutover is a switch, not a scramble — rollback stays armed until validation passes.
04
Validate
Workload-level checks against the original environment before anything on-prem is powered down or decommissioned.
05
Optimize
Instances right-sized to real usage, resources tagged, and a cost baseline handed over — not left for you to discover in next month's bill.
What we take on

Migration work, end to end.

From a straight rehost to a full replatform, each engagement is scoped to how much your environment can safely change in one pass.

Lift & shift

Rehost physical and virtual servers as-is. The fastest, lowest-risk way off hardware that's out of warranty or out of capacity.

Replatform & refactor

Modernize databases and applications as they move — managed database engines, containers, and autoscaling, not a like-for-like copy.

Data migration

Bulk transfer with checksums and continuous sync windows, so the cutover itself is minutes of downtime, not a weekend.

Disaster recovery cutover

We treat the migration itself as a rehearsed DR failover, with a tested rollback — not a one-way door.

Cost & rightsizing

Instances sized to actual measured usage and tagged for ownership — a cost baseline you can hold teams to.

Post-migration support

90 days of monitoring and tuning after the last wave lands, so issues surface to us before they surface to your users.

Case record

One environment, six waves, on schedule.

CASE · REGIONAL-HEALTH-NET

Regional Health Network

Three aging physical data centers running VMware, migrated to an Azure hybrid landing zone ahead of a hardware end-of-support deadline — with clinical systems staying online throughout.

FROM
3 on-prem data centers, VMware
TO
Azure, hybrid landing zone
SCOPE
84 servers, 6 migration waves
TIMELINE
11 weeks, no unplanned downtime
84Servers migrated
38 minAverage cutover window
6/6Waves landed on schedule
100%Legacy DCs decommissioned on plan

Your on-prem environment has an expiration date. Leave before it becomes an emergency.

Book a migration assessment